In 2009 that LAS Solutions signed the first service contract with Egis Projects for technical consultancy as member of the Operational Readiness and Airport Transfer (ORAT) team for the New Larnaka Airport Terminal in Cyprus.

Since then we have managed to be awarded and execute successfully various projects and the most important are listed below:

BHS Operations & Maintenance  – Larnaka International Airport (2010)

ORAT Technical Consultancy  – Larnaka International Airport (2009)

Management of BHS Service Contract – Athens International Airport (2010)

Replacement of Power Turn Conveyors – Athens International System (2011)

Replacement of the ATR System – Athens International System (2012)

New Baggage Management System – Athens International System (2013)

Relocation of a Reclaim Loop – Athens International Airport (2014)

Installation of New Check-in Counters – Athens International Airport (2015)

Font Resize
Contrast